Daniel, this is so relevant.

The two-attendee figure, in my view, is not a failure of interest — it is a symptom of the very problem the session was designed to address. People are too cognitively saturated to carve out time for a conversation about cognitive saturation. The urgency of the immediate consistently displacing the importance of the structural. That pattern plays out more often than we acknowledge.

Guadalupe’s reframe is so pertinent: the human is rarely the origin of failure; the human is usually where a system-level failure becomes visible. What matters is not who failed — it is what conditions shaped performance.

And yet, the absence of human factors specialists in procurement rooms remains a pattern that is largely invisible — and in my view, the effects are both telling and costly. Late-stage human factors corrections cost considerably more than early-stage integration. That is not an HR argument. It is a capital allocation one.

Which brings me to what resonates most from your piece:

Inside an OCC during a peak disruption, 20 uninterrupted minutes is not a realistic condition — interruptions are not exceptions; they are the environment itself

Most crew control systems are designed for rule-based behaviour, in environments that increasingly demand knowledge-based responses

Novel disruptions — unexpected fleet swaps, cascading crew illegalities, multi-hub failures — require active reasoning, not procedural recall

That gap between system design assumption and operational reality is not a training failure; it is a design failure the industry has been funding indefinitely through deferred consequences

The human cognitive capacity available at 0300, mid-disruption, on a fourth consecutive shift is finite and precious. Treating it as an assumed-infinite commodity is not just an ethical gap — it is an operational liability with a deferred and inevitable invoice.

So, the question worth carrying into every procurement conversation, every RFP, every system design brief is not "what does this system do?" — but "what does this system ask of the humans who will operate it under the worst conditions we can realistically imagine?"

If that question isn't answered before the build begins, the industry will spend considerably more answering it afterward. And the invoice, when it arrives, will not come with an itemized breakdown of where the design decisions were made.